Gypsum Industrial Facility

Project Information

Facility is responsible for the fabrication of tissue, packaging and building products

The facility is 13 acres in size and has two drainage basins with direct discharge to Blair Waterway in Tacoma, WA.

Project Details

  • Project Name: Gypsum Stormrwater Treatment
  • Client Name: Confidential
  • Location: Tacoma, WA
  • Technology:  Adsorptive Multi-Media
  • Flow Rate: 200-GPM
  • Constituents:  Turbidity, pH, total metals, TPH
  • Operational:  October 2019 – Present
  • Gallons Treated to Date: 2.2 Million Gallons

Ready to Start Your Project?