This commercial building construction project spanned 2 acres and included excavation depths up to 45'. Clear Water designed, installed, and operated an active treatment system to treat influent water through 2 consecutive wet seasons. Additionally, Clear Water staff performed all CESCL inspections and managed Department of Ecology sampling and reporting for the duration of the project. Clear Water's system ensured the site remained in compliance during rain events, allowing construction to proceed on schedule.