The Hoh River bank stabilization project aimed to improve parts of US 101 by providing protection against erosion from the Hoh River through the installation of engineered log structures as riverbank protection. The project also involved building an access road, installing a bulk bag isolation dam, drainage, placing riprap, driving steel H-pile, structural excavation, backfilling, contour grading, and planting. Clear Water Services was brought in to assist with stormwater treatment and dewatering during construction phases.