This project at the Port of Seattle involved the maintenance and update of the Terminal 5 berth, as well as utility upgrades adjacent to the terminal. Clear Water was called in to treat several known contaminants in the groundwater, as well as for stormwater management. The project required the installation of two 250gpm CESF systems, both with carbon filtration for contaminant removal. One of the systems ultimately required an upgrade to a 500gpm flow rate capacity, which Clear Water was able to mobilize in one day.