Skip to main content
Services
Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
Resources
About Us
Our Company
Careers
3D System Walkthrough
ProjectsLogin
Contact
Services
Previous

Services

Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Previous

Solutions

Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
ResourcesAbout Us
Previous

About

Our CompanyCareers3D System Walkthrough
ProjectsContactLogin

Article

California ERA Season Is Here: What Industrial Facilities Need to Know in 2025 - Frog Environmental

Learn what California industrial facilities need to know about ERA season under the IGP. This guide covers ERA Level 1 and Level 2 requirements, compliance deadlines, and how expert support can help you avoid fines and lawsuits.

Enter your email to view this content

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Date
Event Details
Author
Follow Us

Stormwater season in California is winding down, but for many permittees under the Industrial General Permit (IGP), that means ERA season is just getting started.

If your facility exceeded Numeric Action Levels (NALs) this monitoring year, you’re likely required to submit an Exceedance Response Action (ERA). Whether you're in Level 1 or Level 2, the deadlines are real, the requirements are detailed, and enforcement is active.

Here’s what California facilities need to know to stay compliant, and how expert support can keep you out of trouble.

Business Question Mark

‍

What is an ERA?

An ERA is a mandated response when stormwater sample results exceed specified pollutant benchmarks (NALs). Facilities that exceed these thresholds are required to evaluate and document what went wrong and what corrective actions they’ll take to fix it.

There are two ERA tiers:

  • Level 1: You must submit an ERA Evaluation prepared by a Qualified Industrial Stormwater Practitioner (QISP), identifying sources of pollution and suggesting Best Management Practices (BMPs).
  • Level 2: You’re required to submit a Technical Report with site-specific design or structural BMPs developed by a QISP — often involving engineered upgrades.

‍

How Do I Know If I Need to File?

Start by reviewing your QSE (Qualifying Storm Event) sample results. Did any exceed these common NALs?

  • Total Suspended Solids (TSS)
  • Oil & Grease (O&G)
  • pH
  • Facility-specific pollutant benchmarks (e.g., metals)

If so, you're likely in Level 1 or Level 2 status — depending on prior years' performance.

Still unsure? Let us complete a sampling review to check your exceedances and help determine your filing requirements.

‍

What’s Required in the Report?

 ERA LevelRequired ActionsLevel 1 On-site evaluation, pollutant source tracking, review of current BMPs, and proposed improvementsLevel 2Site-specific BMP design, QISP-led reporting, submission of technical report including performance projections

These reports must be completed and submitted through the SMARTS system by the official deadline.

‍

What Happens If I Don’t File?

California regulators and environmental groups are actively monitoring non-compliant sites. Missing your ERA obligations could result in:

  • Formal enforcement actions
  • Fines and penalties
  • Lawsuits from environmental NGOs
  • Loss of permit coverage

In short, ERA noncompliance is a liability your business can't afford.

‍

How We Help

At Frog Environmental, we specialize in stormwater compliance and ERA reporting. Our team includes certified QISPs and stormwater professionals who have filed hundreds of ERA Evaluations and Technical Reports for facilities across California.

We handle:

  • Data analysis + NAL comparison
  • On-site evaluations
  • BMP planning and design
  • SMARTS report submission
  • Regulatory communication

‍

Not Sure Where to Start?

We’ve created a set of free downloadable resources to help you navigate ERA season with confidence:

ERA Readiness Checklist

ERA Information and Timelines (PDF)

‍

Let’s Make This Season Less Stressful

We believe ERA season doesn't have to be a scramble. With the right support and a clear plan, you can stay compliant, avoid fines, and protect your facility from unwanted attention.

Article

Stormwater Compliance During a Super El Niño

How will the Super El Niño impact West Coast precipitation this fall and winter, what does it mean for compliance, and how can you prepare?

Article

All About Chemically Enhanced Sand Filtration (CESF)

One of Clear Water’s best tools for treating sediment-laden or turbid water is chemically enhanced sand filtration, or CESF - but what is it and how does it work?

Article

Clean SWPPP: A Guide to Stormwater Compliance in Washington

Stormwater, SWPPP, ISGP, NPDES, CWA, BMPs? What does it all mean? Here we're covering the basics of stormwater compliance in the state of Washington.

Get started with your project

If you're looking for more information about our products or services, or you're ready to get started, let's connect.
Our team of experts is ready to make your project a reality.
Get started
Services
Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
Resources
ProjectsProductsArticles & Upcoming Events3D System WalkthroughChemical Dosing Calculator
About Us
Our CompanyCareersContact Us
Login
Client Portal

Get the latest from us

Be in the know with news, upcoming events, and treatment tips for your project.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
© 2020 Clear Water Services. All Rights Reserved.
Website by GiganticCCPA PrivacyCookie PolicyPrivacy Policy