Skip to main content
Services
Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
Resources
About Us
Our Company
Careers
3D System Walkthrough
ProjectsLogin
Contact
Services
Previous

Services

Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Previous

Solutions

Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
ResourcesAbout Us
Previous

About

Our CompanyCareers3D System Walkthrough
ProjectsContactLogin

Article

It's ERA Season! - Frog Environmental

It's ERA season! Read more about what an ERA is, and what is required if your facility needs one.

Enter your email to view this content

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Date
Event Details
Author
Follow Us

What is an Exceedance Response Action (ERA) Report and Do I Need One?

State regulations require some facilities to take action to lower a pollutant in their storm water discharge. Not only this, but the Water Board requires permittees to follow their mandated, specific process to implement and document the improvements that are made. If the facility doesn't follow this process, the Water Board will not recognize these improvements.

‍

So, what is this process?

The first step depends on what compliance level your pollutant is (please note that different pollutants can be at different levels).

Facilities with Level 1 pollutants must have a Qualified Industrial Stormwater Practitioner (QISP) help them conduct their Level 1 ERA Evaluation by October 1. The Level 1 ERA Report (the document that corresponds with the evaluation) must be submitted by January 1.

The process for Level 2 facilities is a bit more complicated. To summarize: the first storm water year that the facility is Level 2, a Level 2 ERA Action Plan must be completed. This document must address each new Level 2 exceedance, map out how they will address the exceedance, choose which approved demonstration they will perform to measure their solution’s effectiveness, and more. It must also be prepared by a QISP and submitted by January 1.

The next year, the facility must submit a Level 2 Technical Report. Its requirements vary depending on the situation, but it must always identify the source of the exceeding pollutants, describe the changes they made to lower those pollutants, and report the outcome of the demonstration the facility chose to perform in the Action Plan. Like the other documents, it must be prepared by a QISP, and submitted online by January 1.

‍

What's next?

If you still need to take any of these steps, we can help! This is an important process that increases in demand as the deadline approaches. A good next step is to have Frog conduct an Engineering Assessment of the site to find economic, practical, and effective solutions.

Article

Stormwater Compliance During a Super El Niño

How will the Super El Niño impact West Coast precipitation this fall and winter, what does it mean for compliance, and how can you prepare?

Article

All About Chemically Enhanced Sand Filtration (CESF)

One of Clear Water’s best tools for treating sediment-laden or turbid water is chemically enhanced sand filtration, or CESF - but what is it and how does it work?

Article

Clean SWPPP: A Guide to Stormwater Compliance in Washington

Stormwater, SWPPP, ISGP, NPDES, CWA, BMPs? What does it all mean? Here we're covering the basics of stormwater compliance in the state of Washington.

Get started with your project

If you're looking for more information about our products or services, or you're ready to get started, let's connect.
Our team of experts is ready to make your project a reality.
Get started
Services
Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
Resources
ProjectsProductsArticles & Upcoming Events3D System WalkthroughChemical Dosing Calculator
About Us
Our CompanyCareersContact Us
Login
Client Portal

Get the latest from us

Be in the know with news, upcoming events, and treatment tips for your project.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
© 2020 Clear Water Services. All Rights Reserved.
Website by GiganticCCPA PrivacyCookie PolicyPrivacy Policy