Skip to main content
Services
Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
Resources
About Us
Our Company
Careers
3D System Walkthrough
ProjectsLogin
Contact
Services
Previous

Services

Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Previous

Solutions

Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
ResourcesAbout Us
Previous

About

Our CompanyCareers3D System Walkthrough
ProjectsContactLogin

Project

Waste Transfer Station Stormwater System

Temporary and permanent systems for a large waste transfer station.

Overview

This transfer station supports several communities in the South Puget Sound region. Industrial activities on site include container storage, parking of employee and company vehicles and equipment, and compressed gas fueling. In partnership with River’s Edge, Clear Water Services designed and installed a 300gpm CESF system to treat oil sheen, turbidity, pH, total copper, and total zinc. Due to necessary infrastructure changes to support stormwater conveyance to the permanent system, a temporary CESF system was mobilized adjacent to the infrastructure work to keep the site water discharge under effluent benchmarks during the construction and mobilization of the permanent system. The site treated over 2 million gallons of stormwater in its first year of operations.

Project Details

Location

Auburn, WA

Industry

Industrial

Services

Treatability

Permitting and Design Services

System Sales & Rental Equipment

Field Services

Products

Drop-in Clarifier

Gallons treated
2,023,750+
No items found.
No items found.

Featured Product

Drop-in Clarifier

Clear Water’s Drop-in Clarifier is designed to be implemented into an existing tank, pond, or other water storage structure on site to maximize the existing storage volume and enhance clarification prior to filtration or other downstream treatment steps.  

This clarification system can increase the settling removal rate by 3-5X over using traditional weir tanks, increasing system efficiency while reducing the overall footprint.

This also allows sites to manage temporary heavy loading conditions without major changes to water treatment equipment or components.

Features Include:

  • Increases settling removal rate by 3-5X over a standard wier tank
  • Manages temporary heavy loading conditions without changing ethe quipment footprint
Flow Rate
See Featured Projects
No items found.

Get started with your project

If you're looking for more information about our products or services, or you're ready to get started, let's connect.
Our team of experts is ready to make your project a reality.
Get started
Services
Treatability
Permitting and Design Services
System Sales & Rental Equipment
Custom Fabrication
Field Services
Training
Solutions
Construction
Industrial
Dewatering
Remediation
Ports & Maritime
Aerospace
Civil
Mining
Energy
Resources
ProjectsProductsArticles & Upcoming Events3D System WalkthroughChemical Dosing Calculator
About Us
Our CompanyCareersContact Us
Login
Client Portal

Get the latest from us

Be in the know with news, upcoming events, and treatment tips for your project.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
© 2020 Clear Water Services. All Rights Reserved.
Website by GiganticCCPA PrivacyCookie PolicyPrivacy Policy