Enter your email to view this content
How to Manage Industrial SWPPP Requirements in California
What does SWPPP stand for?
SWPPP stands for Stormwater Pollution Prevention Plan.
What is the purpose of a SWPPP?
A Stormwater Pollution Prevention Plan (SWPPP) is a site-specific document that identifies operations and pollution control practices that are being implemented to prevent and minimize pollutants from reaching stormwater runoff. The SWPPP is required by stormwater permits pursuant to local permitting authority’s adopted NPDES program. Among other things, the SWPPP requires BMP (Best Management Practices) to prevent or minimize stormwater pollution.
Do I need a SWPPP?
If your business is defined as Industrial, and your facility operations contribute to storm water runoff, you are required to apply for California’s Industrial General Permit. A SWPPP is required for an Industrial General Permit holder to discharge stormwater. Dischargers that qualify for a Non-Exposure Certification (NEC) are exempt from the SWPPP requirements.
When do I need to complete the SWPPP?
The SWPPP should be prepared before submitting a Notice of Intent (NOI) or General Permit application, and the SWPPP should be implemented by the start of industrial operations.
How do I submit or revise the SWPPP?
In California, the SWPPP is required to be submitted electronically through SMARTS (Stormwater Multiple Application and Report Tracking System). SWPPPs should be revised whenever it is necessary. The SWPPP is considered a living document and must be updated to reflect any changes in industrial operations and pollution prevention practices. The SWPPP also requires an Annual Comprehensive Facility Compliance Evaluation.
Who submits the SWPPP?
Within the SMARTS program, Dischargers are required to certify and submit Permit Registration Documents. The Discharger must assign a LRP (Legally Responsible Person), who is required to submit documents related to permit coverage via SMARTS. SWPPPs are submitted and certified by the LRP for NOI coverage.
What if I need professional assistance with my SWPPP?
Our team can help assess, implement, and maintain your SWPPP strategy. We start by conducting a site walk to evaluate your industrial facility, assess your potential pollutant sources, and recommend Best Management Practices (BMPs) to reduce pollutants in your stormwater runoff. Then, we develop your SWPPP, which includes stormwater outfalls and sampling points, as well as a facility diagram, a potential pollutant diagram, and a monitoring diagram. Our writers can also update your existing SWPPP to bring your facility into compliance, if needed. SWPPP development can be part of an annual monitoring contract or a stand-alone service.





