IKEA Renton

Aerial view of a stormwater treatment system in a construction parking lot

Project Information

Clear Water provided efficient dewatering for the construction of the new IKEA store in Renton. A single operator controlled multiple systems at this large site.

The turbidity of the incoming water was routinely above 1,000 NTU.

Clear Water also provided CESCL services for the duration of this project.

Project Details

  • Location: Renton, WA
  • (2) 500 GPM Active Treatment System (ATS) utilizing Chitosan Enhanced Sand Filtration (CESF)
  • 7 Months Operational
  • 12-Acre Site
  • 7,482,649 Gallons Discharged

Ready to Start Your Project?