
Clear Water was contracted to Prospect Construction for the Prospect South Park Pump Station construction project.
This project is owned by the City of Seattle and is centered around the preparatory work for the eventual South Park water treatment system.
This treatment system has been operational since October of 2020 and is designed to meet a design flow rate of 200-GPM,
The project utilizes adsorptive multi-media (through virgin granular activated coconut carbon (GAC)) to address chlorinated solvents in dewatering applications, but numerous other contaminants were discovered when excavation began.
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.