Materials Recovery Facility

Industrial Water Treatment System on Pier 96 in San Francisco

Project Information

The Materials Recovery Facility in San Francisco opened in 2002 and is approximately 185,000 ft2 in size. The facility processes approximately 750 tons of commingled materials every day. It is the largest exporter of waste paper on the West Coast.

Throughout the site, multiple sampling locations in 2015 through 2018 exceeded numeric action levels (NALs) for Total Suspended Solids (TSS), Oil & Grease (O&G) and heavy metals, as well as Chemical Oxygen Demand (COD).

Project Details

  • Project Name: Materials Recovery Facility
  • Location: San Francisco, CA
  • Technology:  CESF
  • Flow Rate: 600 GPM
  • Constituents:  Turbidity, pH, TSS, Metals, COD
  • Operational:  December 2018 – current date
  • Gallons Treated to Date: 2,251,875 Gallons
  • Avg. Annual O&M Cost: $61,010.46
  • $/Gallon to Date:  $ 0.02709