Esterra Block

Commercial building stormwater treatment and dewatering system

Project Information

This is a commercial building construction project on 2 acres with a 45’ excavation depth. Clear Water treated water throughout the 2019-2020 wet season and will be re-installing a treatment system for the 2020-2021 wet season.

In addition to treatment system design, installation, and operation, Clear Water performs all CESCL inspections and Department of Ecology reporting for this project.

Project Details

  • Project Name: Esterra Block 3
  • Client Name:  JTM Construction
  • Location:  Redmond, WA
  • Technology:  CESF
  • Flow Rate: 300 GPM
  • Constituents:  Turbidity/pH
  • Operational: September 2019 – Present
  • Gallons Treated to Date: 450,000 Gallons