LA Stadium at Hollywood Park

LA Stadium Construction Stormwater Treatment System

Project Information

  • Airport FAA Height Restrictions
  • Nearby Fault Line
  • Below Grade Excavation
  • Excess Rainfall flooded excavation….Clear Water called in to address Critical Path

Project Details

  • 500 GPM Chitosan Enhanced Sand Filtration (CESF) System
  • 4 years Operational
  • 2 Contractors:
    • Kiewit
    • Turner-Aecom/Hunt JV
  • 42,139,840 Gallons Discharged
  • Total Project Rainfall: 29” (wet seasons only)
    • 21% Above Average Rainfall
  • Summer Stand-By
  • 2,062 Operational Hours
  • $/Gallon: $0.0123